s 日韩一级二级,成人小视频免费看,国产不卡免费
中文 / English
    1.  
      企業(yè)郵箱 招聘英才 聯(lián)系我們
      Home >  News Center >  CorporateNews

      Return from Sea Trial Triumph in wind and waves

          久久96国产精品久久99软件,日韩av在线免费,337p亚洲精品色噜噜,亚洲骚少妇,欧美精品一区二区免费,日韩视频在线观看视频,国产精品视频免费观看有多少集

          <button id="xgdaf"><cite id="xgdaf"></cite></button>
          <button id="xgdaf"><optgroup id="xgdaf"></optgroup></button>
          <button id="xgdaf"><cite id="xgdaf"><ins id="xgdaf"></ins></cite></button>

        1. <ins id="xgdaf"><cite id="xgdaf"><wbr id="xgdaf"></wbr></cite></ins>
          <pre id="xgdaf"><blockquote id="xgdaf"><pre id="xgdaf"></pre></blockquote></pre>
          <dl id="xgdaf"></dl>
          <button id="xgdaf"><cite id="xgdaf"></cite></button>

           

          On July 13, the second 85,000m3 very large ethane ethylene carrier (VLEC)built by DSIC for JHW company returned from sea trial triumph during which all the trial tasks were completed in only 3 days, and its performance indexes were highly appraised by the shipowner.

           

          Successful sea trial

          The ship left port for trial at 10 am on July 10, and all the test items were submitted for inspection at 22:00 on July 12, with the total test time of 60 hours.

           

          Overcoming the impact of the epidemic

          In the first half of the year, with the active cooperation and strong support of the ship owner and inspectors, DSIC has overcome many unfavorable conditions, such as shortage of manpower and failure of overseas service providers to arrive at the factory on schedule during the epidemic period. In only 20 days, DSIC completed a series of major works such as the main engines, shaft generators, steering engines, empty ship weighing and so on.

           

          Shorten the trial period

          During the sea trial, the project team and commissioning group have overcome the difficulties by formulating a complete trial plan, combining the similar terms reasonably according to the working conditions and requirements of various tests, so as to realize seamless connection of each test with the ship owner and inspectors. Based on various measures, the total test time was reduced from the original plan of 108 hours to 60 hours,which shortened the trial period. All test items have been inspected and accepted by the shipowner at one time, and the qualified rate is 100%.

           

          The series of 85000m3 VLEC project is a milestone for DSIC to open up the gas carrier market and realize product transformation and upgrading. With the smooth delivery and operation of the first carrier, it has been highly recognized by mainstream energy companies and shipowners in the industry, which has established the leading position for DSIC in domestic gas carrier assembly plants.

           

          Address: 1 Yanhai Street, Dalian, Liaoning Province, China(To browse the contents, use IE6.0 or above)
          Copyright@2005 dsic.cn All Rights Reserved
          Tel: 86-411-84482888 Fax: 86-411-82633461 E-mail: dsic@dsic.cn
          遼ICP備06004983號(hào) Technical Support: Shipol