s 亚洲精品97,亚洲午夜精品在线观看,来个一级毛片
中文 / English
  •  
    企業(yè)郵箱 招聘英才 聯(lián)系我們
    Home >  News Center >  CorporateNews

    DSIC Delivered 3rd 9250TEU Containership Successfully

    久久96国产精品久久99软件,日韩av在线免费,337p亚洲精品色噜噜,亚洲骚少妇,欧美精品一区二区免费,日韩视频在线观看视频,国产精品视频免费观看有多少集

    <button id="e5uet"><cite id="e5uet"><center id="e5uet"></center></cite></button>
  • <th id="e5uet"></th>


      On Feb. 5, CMA CGM?Loire River, the 3rd 9250TEU containership was named and delivered to French CMA CGM , the 3rd largest global liner by DSIC. Up to now, DSIC has delivered 3 9250TEU containerships successfully, whose design and construction quality have reached to the first-class international level.  

      This type of containership can load 9289 TEU containers with an overall length of 300m and a displacement of 110,000 tons under full load, where the new type of ballast water treatment unit and quick oil recovery system are equipped aboard to meet IMO (2025) emission standard in advance. Meanwhile, several energy-saving actions have been adopted, such as economic speed design, high-efficiency rudder and new-type M/E, etc.


      To ensure the building quality of 3rd vessel to reach a new height, DSIC has conducted the planning and management elaborately, where relevant improvement and refining operations have been made in response to the design characteristics and key control points of the vessel during final erection. On the premise of ensuring cargo hold sizes to meet the requirements of container trial, strengthen the control and monitor on the hatch level. Combining the block form and size of engine room, tail shafting and rudder, define the targeted location and baseline, through overall measurement, draw the pre-erection baseline of general block on ground and monitor the variation between baseline and general block at various stages and revise timely to ensure the data optimization of general blocks. Facing the construction problems, DSIC has gathered excellent technical forces to organize an elite team, who have begun to prepare in terms of workmanship and technique innovation and precision control, further strengthened the whole-process quality control on rudder system construction, and gone deep into study of rudder system building technology, during which, the technical staff fully follow up to instruct the aligning link of steering gear installation to lay a firm foundation on localizing the benchmark of rudder system installation successfully.

      Address: 1 Yanhai Street, Dalian, Liaoning Province, China(To browse the contents, use IE6.0 or above)
      Copyright@2005 dsic.cn All Rights Reserved
      Tel: 86-411-84482888 Fax: 86-411-82633461 E-mail: dsic@dsic.cn
      遼ICP備06004983號 Technical Support: Shipol